SPRAYING and INJECTION SYSTEM



TERMITE INTEGRATED MANAGEMENT  (SPRAYING and INJECTION SYSTEM)
Chemical Methods Barrier System (CBS) is intended to:a. For the building not yet built (Pre-Construction Building)b. For buildings already built (Post-Construction Building)Pest Coverage: All Types Land Termites (subterranean Termites)

WORK PROCEDURES
Procedure of work will be done in the following manner:
1. Pre-Construction
a. Treatment Foundation (Foundation)Intended to create a barrier layer for subterranean termite colony can not enter the building through the foundation / floor.Stages of implementation as follows:i. Conducted spraying into the foundation excavation and foundation walls as much as + 5 liter/m2.ii. Performed on ground spraying urug after foundation installed in stages until the entire foundation is covered by soil urug.
b. Soil Treatment (ground floor)Intended to protect the entire floor of the building of the possibility of rising to the top of termites in the future.Stages of implementation as follows:i. Spraying is done after the process is completed and leveled land urugan to make the work floor. Spraying can also be done when the soil was backfilled with sand urug work floor.ii. Conducted spraying in the upper layers of soil on the floor of the building as much urug + 5 liter/m2.

a. Wood Treatment (Wood)Intended to coat the wood with Termiticide before in-finishing to prevent any attack in the future.Stages of implementation as follows:i. Conducted resurfacing / spraying Termiticide on all wood jamb that has not been painted on buildings, according to the stages of development.ii. Conducted resurfacing / spraying Termiticide on all wood roof structure that is on the horses and the ceiling before being installed in order for resurfacing / spraying can be more thorough.iii. Termiticide solution that will be sprayed on the wood as much as 0.3 ltr/m2.


1. Post-Construction
a. Treatment Foundation (Foundation)Intended to create a barrier layer for subterranean termite colony can not enter the building through the foundation / floor.Stages of implementation as follows:i. Conducted drilling floor (diameter 8 mm) on both sides of the foundation wall every 30-40 cm, with 5 ltr larutan/m1 according to the conditions in the field.ii. Termiticide solution and then injected into each hole ± (2 liters) to form a bonding barrier layer in the soil.iii. Performed the closing holes with similar colored cement floor with color.

 