Termite System

Methods: Chemical Barrier System (CBS)
a. For buildings not yet built (Pre-Construction Building)
b. For buildings already built (Post-Construction Building)
Pest Coverage: All Types Land Termites (Subterranean Termites)


WORK PROCEDURES

Procedure of work will be done in the following manner:

1. Pre-Construction

a. Treatment Foundation (Foundation)
Intended to create a barrier layer to an underground colony of termites can not enter the building through the foundation / floor.
Implementation stages as follows:
i. Conducted spraying into the excavation of foundations and foundation walls as much as + 5 liter/m2.
ii. Performed after spraying the embankment foundation installed in stages until the entire foundation is covered by embankment.

b. Soil Treatment (ground floor)
Intended to protect the entire floor of the building of the possibility of rising to the top of termites in the future.

Implementation stages as follows:
i. Spraying carried out after the process is completed and leveled the ground urugan to make the work floor. Spraying can also be done when the soil was backfilled with sand embankment work floor.
ii. Done spraying the upper layers of embankment on the floor of the building as much as + 5 liter/m2.

c. Wood Treatment (Wood)
Intended to coat the wood with in-Termiticide before finishing to prevent future attacks.

Implementation stages as follows:
i. Carried out resurfacing / spraying Termiticide on all the wood sill that has not been painted on buildings, according to the stages of development.
ii. Carried out resurfacing / spraying Termiticide on the roof of the wooden structure on the horses and the ceiling before reinstalling with the aim that resurfacing / spraying can be more thorough.
iii. Termiticide solution that will be sprayed on the wood as much as 0.3 ltr/m2.


2. Post-Construction


a. Treatment Foundation (Foundation)
Aimed to create a barrier layer that subterranean termite colony can not get into the building via foundation / floor.

Implementation phases are as follows:
i. Drilling the floor (8 mm diameter) on both sides of each foundation wall 30-40 cm, with 5 liters larutan/m1 according to the conditions in the field.
ii. Solution Termiticide injected into each hole and then ± (2 liters) to form a bond of barrier layer in the soil.
iii. Made the closing holes with similar colored cement floor with color.

WARRANTY
Warranty reworking of warranty at no cost if during the validity period of the warranty is still found in the incidence of subterranean termites (Subterranean Termite) in the building that has been done previously controlled.neither guarantee no damage to buildings and replacement of the goods. This warranty will fall and if there are additional building / new building materials that contain wood without first confirmed.


Contact:
M. Susanto

0813.8650.1642
021-9604.6408